1- Assembly of railway track on ballast
2- Mounting of railway track on plate
3- Railway track renovations
4- Installation of railway devices, diversions, escapes and crossings
5- Discovery of railway
6- Substitution of useless rails, sleepers, semichanges, hearts, struts and check rails
7- Placement of supplements and replacement of bearings, pads, stops, struts, supports and useless angles
8- Squaring and redistribution of sleepers
9- Correction of the width of the railway
10- Regulation and repair of diversions and crossings
11- Tightening and consolidation of the fastening
12- Welding, homogenization and stress release
13- Control, repair and replacement of welds
14- Replacing a glued insulating joint
15- Repair of the floorboards and check rails of the level crossings
16- Manual and mechanical leveling, alignment, batting and profiling

1- Armor and lane placement

2- Rail leveling

3- Rail welding

4- Grinding welding

4- Concreting

5- Concrete polishing

6- Type I concreted railway

7- Type II concreted railway

8- Type III concreted railway

9- Type IV concreted railway

1- Placement sleepers

2- Placement pairs

3- Lane placement

4- Manual batting

5- Rail welding

6- Frosted rail

7- Heavy hitting

8- Profiling

9- Assembled railway track

Strail Placement

Pedestrian placement

Railroad platform cleaning

Slope protection on railway